Soft-Story
Wood-frame buildings with parking or retail on the ground floor, permitted before January 1, 1978. Most common in Koreatown, East Hollywood, and Silver Lake. Deadline depends on unit count.
Los Angeles · LADBS Ordinance 183893 & 184081
Send us the address. Within 48 hours you’ll get a one-page report that tells you which ordinance applies (if any), what the typical scope looks like, and what it usually costs. No cost. No obligation. No sales call unless you ask for one.
Or call (323) 334-0991. We pick up 8am–6pm, Monday to Saturday.
There are three separate retrofit ordinances in the City of Los Angeles. They cover different building types, have different deadlines, and cost wildly different amounts. Most owners we talk to think they’re under one when they’re actually under another.
Wood-frame buildings with parking or retail on the ground floor, permitted before January 1, 1978. Most common in Koreatown, East Hollywood, and Silver Lake. Deadline depends on unit count.
Older concrete frames with brittle columns and not enough rebar. Highest cost category by a wide margin. LADBS has been strict on deadlines for these.
Brick buildings where the walls aren’t tied to the floors or roof. Common on older commercial corridors in Boyle Heights and West Adams. Usually paired with parapet bracing.
Not sure which one applies? That’s what the free check is for. Send the address
Steel moment frames, shear walls, and foundation anchoring. Usually 4–8 weeks of construction once permits clear. Permitting is the long part.
Foundation bolting and cripple wall bracing for older single-family homes. We check EBB grant eligibility as part of the report — it opens and closes on a schedule.
Column jacketing, new shear walls, sometimes FRP. Longer timelines. Engineer-led scope from day one.
Wall anchorage, parapet bracing, foundation upgrades. Often combined with a facade or tenant improvement project.
Engineer, permits, contractor, inspections. You talk to one person, and we keep everyone else moving. Licensed engineers design the retrofit and licensed contractors build it. We make sure it actually gets done, on the city’s clock and not someone else’s.
Free. Which ordinance applies, what’s on file with LADBS. 48 hours.
We bring in a licensed engineer for the site visit, design, and calcs.
We track the submittal and chase corrections so it doesn’t sit in the queue.
Licensed contractors bid against the engineer’s plans. You pick.
We keep the schedule, line up inspections, and keep you posted weekly.
Final inspection passed, compliance filed. You get the paperwork for your records.
30 seconds
Just the address. No survey, no permit number, no title report. We pull everything else from public records.
1–2 business days
Ordinance status, year built, unit count, and any prior retrofit permits on file.
One page. Plain English. Which ordinance applies, what the typical scope looks like, ballpark cost range, and the next step if you want to take one.
If you want to move forward, we connect you with a licensed structural engineer for an on-site assessment. If you don’t, the report is still yours to keep.
Not “greater LA”, not Orange County. Los Angeles city limits. That means we know the LADBS plan check queue, which inspectors are strict on what, and which engineers turn reports around in two weeks versus two months.
Every report goes through a licensed structural engineer before it reaches you. If the scope doesn’t hold up, it doesn’t go out.
If the building isn’t in scope, the report says so, and you keep it for your records. That happens more often than you’d think.
Takes about 30 seconds. Report lands in your inbox within 48 hours.
1 of 3
Prefer to talk first? Call (323) 334-0991. We pick up 8am–6pm, Monday to Saturday. If we miss you, we call back the same day.
Good. This is a free second opinion on eligibility and scope, not a proposal. Plenty of our reports confirm the existing scope. Some don’t.
No. It’s a records check. The report goes out either way. If the building doesn’t need anything, the report says that.
Yes. That’s why we quote 48 hours, not two weeks.
Licensed contractors and licensed engineers. We coordinate intake and the records check. We don’t swing hammers.